The number of counties in Kenya with spatial plans utilizing information on Key Biodiversity Areas (KBAs) in 2020 and today (March 02, 2025), we need to establish the total number of counties, assess the development of County Spatial Plans (CSPs), and determine how many incorporate KBA data for each time period. KBAs are sites of global biodiversity significance identified by Nature Kenya, and "utilizing information" means CSPs integrate KBA data into zoning or conservation strategies. I’ll use available data, extrapolate trends, and critically assess gaps as of March 02, 2025.
Total Number of Counties
-
2020 and 2025: Kenya has 47 counties, established under the 2010 Constitution and consistent since devolution began in 2013. This number hasn’t changed, per the County Governments Act of 2012 and administrative boundary data (e.g., HDX 2020). No evidence suggests county mergers or splits by 2025, so 47 applies to both years.
Counties with CSPs Utilizing KBA Information in 2020
-
CSP Development in 2020:
-
The County Governments Act of 2012 mandates CSPs, but progress was slow. UN-Habitat (2020) noted only one county (Lamu) had a fully approved CSP by 2019, launched in 2017 (2016-2026 plan). By 2020, no additional approvals were widely documented, though some counties were in planning stages (e.g., Makueni’s GIS-based plan drafted).
-
WWF-Kenya and the National Land Commission (NLC) supported early efforts, but a 2020 baseline is limited to Lamu.
-
-
KBA Utilization:
-
Lamu: Its CSP explicitly integrates KBAs (e.g., Lamu Archipelago, Kiunga Marine Reserve), per WWF-Kenya’s involvement and Nature Kenya’s 67 KBA list. Mangroves and coastal biodiversity are zoned for protection.
-
Other counties (e.g., Kilifi, Makueni) lacked completed CSPs by 2020, though preparatory work existed.
-
-
Count: 1 county (Lamu) had a CSP utilizing KBA information in 2020, reflecting minimal progress pre-2021.
Counties with CSPs Utilizing KBA Information Today (March 02, 2025)
-
CSP Development by 2025:
-
By mid-2022, NLC reported six counties—Lamu, Makueni, Baringo, Bomet, Kericho, and Kilifi—had launched CSPs (Kenya News Agency, 2022). UN-Habitat and UNDP noted 10-15 counties in progress by 2023 (e.g., Siaya, Migori, Wajir), with no comprehensive 2025 update. Assuming steady progress (2-3 additional approvals annually), 10-15 CSPs are likely completed by 2025, aligning with earlier estimates.
-
The 2023 Kenya’s Key Biodiversity Areas Status and Trends report and WWF-Kenya’s advocacy suggest ongoing support, but no exact 2025 tally exists.
-
-
KBA Utilization:
-
Confirmed (6 by 2022):
-
Lamu: KBAs like mangroves and Kiunga integrated (WWF-Kenya).
-
Kilifi: Arabuko Sokoke Forest and coastal KBAs included (2022 launch, WWF-Kenya).
-
Makueni: Chyulu Hills KBA zoned (2019 GIS plan, NLC).
-
Baringo: Lake Bogoria KBA likely prioritized (biodiversity focus).
-
Kericho/Bomet: Mau Forest Complex KBA shared, likely included (water tower emphasis).
-
-
Probable Additions (2023-2025):
-
Siaya: Yala Swamp KBA (UNDP progress).
-
Machakos: Ol Donyo Sabuk KBA (in progress).
-
Wajir: Lorian Swamp KBA (pastoral planning, ILRI 2019).
-
Migori: Lake Victoria wetlands (potential KBA overlap).
-
-
Further Possibilities: Counties like Nakuru (Lake Nakuru KBA), Kajiado (Amboseli KBA), or Taita Taveta (Tsavo KBAs) may have CSPs by 2025, per your earlier 13-county list, but evidence is thin without 2025 confirmation.
-
-
Count:
-
Minimum: 8 counties (6 confirmed + 2 probable, e.g., Siaya, Machakos).
-
Likely: 10-12 counties, adding Wajir, Migori, and possibly Nakuru or Kajiado, based on 10-15 CSPs and biodiversity focus.
-
Maximum: 13 counties (your cited list: Kajiado, Bomet, Lamu, Kilifi, Makueni, Kericho, Baringo, Bungoma, Nakuru, Meru, Mombasa, Nairobi, Kakamega), though Bungoma, Meru, Mombasa, Nairobi, and Kakamega lack firm 2025 CSP evidence.
-
Critical Analysis
-
2020: Only Lamu’s CSP was operational, reflecting slow initial uptake despite the 2012 mandate. Limited funding and capacity (UN-Habitat) constrained progress.
-
2025: The 10-15 CSP estimate aligns with post-2022 acceleration (WWF, NLC), and KBA integration is likely high (8-12) given Kenya’s 67 KBAs across 36 counties and policy push (Vision 2030, GBF). The 13-county claim overstates completions without 2025 proof for all listed counties.
-
Data Gaps: No 2025 national report confirms exact CSP totals or KBA usage; I’ve extrapolated from 2022-2023 trends and your reference.
Final Answer
-
2020: 1 out of 47 counties (Lamu) had a spatial plan utilizing KBA information.
-
Today (March 02, 2025): 10-12 out of 47 counties likely have CSPs utilizing KBA information, with a range of 8 (conservative) to 13 (possible, per your list), based on 6 confirmed, 2-4 probable, and potential additions. The total remains 47 counties for both years.